All Tenders


Sr No. Office Section/ Division NIT No. Subject/ Particulars Issued On Last Date Download
91All India RadioEngineering02/AE(E)/MHT/Tower A/NIT/2019-2020MOEI and Fans, LT Panel etc. at DDB Tower A Mandi House, New Delhi. Sh-Providing ligh/power pointswitches, wiring, DB etc. in tower A , 9th floor, 10th floor tower B) 2019-05-212019-05-27Download
92All India RadioEngineeringSPECS 10 kW FM TX/9/4/2014-D(TD/FM)Specification for supply of 10 kW Digital Compatible VHF FM solid state MOSFET technology based broadcast transmitter (Liquid Cooled) in 1 plus 1 configuration and associated equipments/items2019-05-202019-06-03Download
93All India RadioEngineeringDEL-3(7/NBH/termite/2019-20/ERegular Post construction anti termite treatment, general pest control and rodent control measures in ALL INDIA RADIO at two locations. 2019-05-202019-05-30Download
94All India RadioEngineering9 /EE(C)BNG/NIT/2019-20Internal painting to office building, 32 Nos type III Staff quarters at EPFO, Mysore. 2019-05-202019-06-03Download
95All India RadioEngineering1/EE(E-II/NIA/2019-20Dismantling and lifting of old Mechanical ventilation system at Soochna Bhawan, New Delhi.2019-05-202019-05-29Download
96All India RadioEngineering03/AE(E)/MH/Tower A/NIT/ 2019-20MOEI and Fans, LT Panel etc. at DDB Tower A Mandi House, New Delhi. Sh-Servicing and overhauling of LT Panels and ACBs rising main etc at DDB Tower A 2019-05-202019-05-27Download
97All India RadioEngineeringEZ 3(6/IEBR/METP/Mast Strengthning Bhawani Patna/2019-20Supply and Fixing of RF chokes, replacement of RF Insulators, supply and installation of copper plate earthing a tension adjustment of all guy ropes and vertically correction of mast at AIR Bhawani Pa2019-05-172019-06-06Download
98All India RadioEngineeringAE(C/LKO/W-7/2019-20/Construction of FM transmitter building at VLPT site Almora UK. SH-Demolishing of old structure coming inside legs of proposed FM steel tower. 2019-05-172019-05-23Download
99All India RadioEngineering52/EDM/Pune/2018-19/2nd callARMO Electrical works at NFAI Pune for 2019-20 Ph I. Sh-Operation and maintenance of Air Conditioning VRF system, Vault III DX Plants split ACs and package Unit at NFAI Ph-I2019-05-172019-05-27Download
100All India RadioEngineering17/AE-E-/Kol/2019-20/ 87P and F LED fittings, modular switch and sockets etc. in Earth Station at Akashvani Bhawan, Kolkata2019-05-172019-05-24Download

.
© Copyright 2018, Website Content Managed by Prasar Bharati (IT Division).
Last Updated on 15/07/2019