| Conducting digital survey for taking post levels of existing FM Campus of AIR at SSB Campus,Narkatiaganj,Sitamarhi, Bathnaha(Forbersganj),Bihar |
All India Radio |
Engineering |
01/EE(C)/CCW/AIR/PD/2020-21 |
|
| Draft Technical Specifications for High Quality Digital Intercom System for Broadcast TV Production |
Doordarshan |
Engineering |
SD 02/2020 |
|
| Corrigendum-1 SITC of 3 Phase, 4 wire 50 Hz, 40 kVA TRUE ON LINE UPS along with Battery Bank and Isolation Transformer at All India Radio, Ratlam. |
All India Radio |
Engineering |
ADGEWZ/AIR PROJECT/E-TENDER 40 KVA UPS/2020-21_1 |
|
| Name of Work Providing services of four 4 nos Data Entry Operator to office of the Executive Engineer (E) CCW AIR Mumbai |
All India Radio |
Admin |
09_EDM_MUM_2020 21 |
|
| CORRIGENDUM-Replacement of 33KV HT FP metal structure and its accessories for Doordarshan Staff Colony, at DDK,Bhubaneswar |
All India Radio |
Engineering |
EE(E)/Kol/NIT/04 of 2020-21 |
|
| CORRIGENDUM: Dehydration, Filtration, Topping up of Transformer Oil for 04 Nos. Transformers i.c Testing of Transformers etc, for first and second Channel Sub Station at DDK, Kolkata. |
All India Radio |
Engineering |
EE(E)/Kol/NIT/03 of 2020-21 |
|
| CORRIGENDUM:Comprehensive annual maintenance for VRF air conditioning system LG make of TVexcellence EDM small studio building and Editing block at SRFTI,Kolkoto |
All India Radio |
Engineering |
EE(E)/Kol/NIT/48 of 2019 - 20 Re call |
|
| CORRIGENDUM :Urgent replacement of HT Panel T.V.R.C at HPT,Murshidabad. |
All India Radio |
Engineering |
EE(E)/Kol/NIT/02 of 2020-21 |
|
| Providing Factory made interlocking paver flooring behind new guest house, near sewage room, adjacent to security fencing at the side of Tata building at ADG(E) office,Chennai-05. |
All India Radio |
Engineering |
AE(C)/Chn/AIR/18/2020-21/1 |
|
| ARMO to electrical works at Films Division Mumbai for the Year 2020 21 SH Comprehensive maintenance of 3 Nos of 16 passenger liftsand 10 Nos Escalators Schindler Make at NMIC Building |
All India Radio |
Engineering |
08 EDM MUM 2020 21 |
|