ARMO E&M services at DDB, Tower-B, Mandi House, New Delhi (SH: Rewiring in corridor i/c providing and fixing 1X1 LED fitting at 3rd floor) |
CCW, AIR |
Engineering |
24/AE(E)/MH-II/NIT?2024-25 Dated 16-08-2024 |
|
Expansion of DD Free Dish Platform by SITC of Additional two streams with RF systems, at Earth Station Todapur, Delhi |
Doordarshan |
Purchase |
NIT-11/2024-25 Dated 20-08-2024 |
|
Providing and fixing profile sheet roofing after dismantling manglore tile roofing of Studio building for arresting leakage at HPT, Akashavani, Bambolim Goa |
CCW, AIR Mumbai |
Engineering |
EEC/MUM/2024-25/22 Dated 20-08-2024 |
|
S.I.T.C of 3X17 tan, air cooled packaged type AC plant at Akashvani Imphal under the scheme FACE LIFT of DD & AIR Channels (BIND) |
CCW, AIR Guwahati |
Engineering |
SE(E)/CCW/AIR/Kol/NIT/04 of 2024-25 Dated 16-8-2024 |
|
Replacement of damaged old sewer line at HPT transmitter premises, Akashwani at Pune, Painting to entrance lobby corridors, shift rest room, toilet thycon hall, electric room knowledge sharing room & AC plant room at HPT Akashwani, Hadapsar Pune |
CCW, AIR Pune |
Engineering |
13/EEC/CCW/AIR/PUNE/2024-25 Dated :16-08-2024 |
|
Structural repairs to RCC column and beam of RCC Over Head water tank upto 10m height & above 10m height including plaster, painting etc. at Akashvani Staff Quarter at Porvorim Goa |
CCW, AIR Mumbai |
Engineering |
EEC/MUM/2024-25/21 Dated 20-08-2024 |
|
Comprehensive Annual Maintenance for VRF air conditioning system (Voltas make) installed in Big Film Studio. CRT building and Sound department at SRFTI, Kolkata |
CCW AIR Kolkata |
Engineering |
Kol-E/2024-25/3(4)/345 Dated 16-8-2024 |
|
Operation & Maintenance EFA system i/c fire fighting system at SRFTI, Kolkata (SH: Replacement of defective butterfly valve, foot valve, damaged M.S pipe etc and providing & fixing various signage board as reqd) |
CCW AIR Kolkata |
Engineering |
AE(E)/SRFTI-II/2024-25/11/87 Dated 16-08-2024 |
|
ARMO E&M Services at DDB, Tower-B, Mandi House, New Delhi. (SH: Replacement of existing sprinkler with sprinkler flexible pipe at 3rd floor corridor) |
CCW AIR |
Engineering |
06/AE(E)/MH-II/2024-25/273 Dated 16-08-2024 |
|
NIQ for providing CC ramp in front of entrance gate at Akashvani transmitter Andawa Prayagraj |
CCW, AIR Prayagraj |
Engineering |
AE(C)/PYG/2024-25/22 to 28 Dated 13-8-2024 |
|