| Replacement of defective Service Connection cable (standby) to Community Center and defective Street light cable between Park Lights at Doordarshan Staff Quarters, HMT Layout, Bengaluru. |
CCW, Akashvani, Bengaluru |
Engineering |
03/EEE/BNG/SDB/2026-27 Dated 01-06-2026 |
|
| Supplying, Installation, Testing and Commissioning of Submersible Pump for the existing Bore well for Akashvani at SPT Complex, Yelahanka, Bengaluru |
CCW, Akashvani, Bengaluru |
Engineering |
02/EEE/BNG/SDB/2026-27 Dated 01-06-2026 |
|
| Supply of 50KVA 3 Phase Automatic Voltage Regulator for 10 KW (1+1) FM Transmitter at Akashvani Jaspur, (New Installation), Amethi, Ayodhya, Agra, Lucknow, Kathua, Rajouri & Almora |
ADG(E-NZ) Akashvani & Doordarshan |
Engineering |
GEM/2026/B/7555503 Dated 01-06-2026 |
|
| Renovation of Gents Toilet at Transmitter Building Akashvani, Sarnath, Varanasi (U.P) |
CCW, AIR Lucknow |
Engineering |
21/EE(C)/LKO/2026-27 Dated 01-06-2026 |
|
| Replacement of 11 KV outdoor CT-PT meter unit including earthing at DDK, Kozhikode |
CCW, AIR Chennai |
Engineering |
02/EE/E/CCW/AIR/CHN/2026-27 Dated 01-06-2026 |
|
| Construction of 10 KW FM Transmitter building at AIR, Jaspur, U.S Nagar (U.K)(SH: Earth filling in near tower portion ) |
CCW, AIR Lucknow |
Engineering |
19/EE(C)/LKO/2026-27 Dated 29-05-2026 |
|
| Renovating old floors with the provision of vitrified tile flooring in room no. 33, 34,35,38,39 & 40 alongwith its corridor at F.F of Akashvani office Lucknow (UP) and Construction of damaged boundary wall shammipur road side at Akashvani transmitter Najibabad |
CCW, AKASHVANI, LUCKNOW |
Engineering |
17 & 18/EE(C)/LKO/2026-27 Dated 29-05-2026 |
|
| Providing and laying Integral water proofing treatment over the terrace by dismantling damaged condemned dilapidated pressed clay tiles and lime concrete including petty repairs etc. at Akashvani office block at Raichur Karnataka and Repairs and Renewal of Gents restroom and Ladies restroom in Ground floor & Gents rest room in Frist floor of studio block at Akashvani, Raichur,Karnataka |
CCW AIR BENGALURU |
Engineering |
NIT 06 2026-27 Dated 29-05-2026 |
|
| Providing GI Chain link fencing with MS angle iron posts and steel gate at front side of Staff Quarters Premises at AV, Karaikal and Internal Painting of LPT building at Akashvani Karaikal Premises |
CCW, AIR, Chennai |
Engineering |
13/EEC/CCW/AIR/CHN/NIT/2026-27 Dated 29-05-2026 |
|
| Providing and laying Integral water proofing treatment over the terrace by dismantling damaged condemned dilapidated pressed clay tiles and lime concrete including petty repairs etc. at Akashvani office block at Raichur Karnataka and Repairs and Renewal of Gents restroom and Ladies restroom in Ground floor & Gents rest room in Frist floor of studio block at Akashvani, Raichur,Karnataka |
CCW AIR BENGALURU |
Engineering |
NIT 05 2026-27 Dated 29-05-2026 |
|