Inner-Banner

Tenders

Subject / Particular Office Section / Division NIT Number Download
S.I.T.C of 3X17 tan, air cooled packaged type AC plant at Akashvani Imphal under the scheme FACE LIFT of DD & AIR Channels (BIND) CCW, AIR Guwahati Engineering SE(E)/CCW/AIR/Kol/NIT/04 of 2024-25 Dated 16-8-2024 S.I.T.C of 3X17 tan, air cooled packaged type AC plant at Akashvani Imphal under the scheme FACE LIFT of DD & AIR Channels (BIND)
Replacement of damaged old sewer line at HPT transmitter premises, Akashwani at Pune, Painting to entrance lobby corridors, shift rest room, toilet thycon hall, electric room knowledge sharing room & AC plant room at HPT Akashwani, Hadapsar Pune CCW, AIR Pune Engineering 13/EEC/CCW/AIR/PUNE/2024-25 Dated :16-08-2024 Replacement of damaged old sewer line at HPT transmitter premises, Akashwani at Pune, Painting to entrance lobby corridors, shift rest room, toilet thycon hall, electric room knowledge sharing room & AC plant room at HPT Akashwani, Hadapsar Pune
Structural repairs to RCC column and beam of RCC Over Head water tank upto 10m height & above 10m height including plaster, painting etc. at Akashvani Staff Quarter at Porvorim Goa CCW, AIR Mumbai Engineering EEC/MUM/2024-25/21 Dated 20-08-2024 Structural repairs to RCC column and beam of RCC Over Head water tank upto 10m height & above 10m height including plaster, painting etc. at Akashvani Staff Quarter at Porvorim Goa
Comprehensive Annual Maintenance for VRF air conditioning system (Voltas make) installed in Big Film Studio. CRT building and Sound department at SRFTI, Kolkata CCW AIR Kolkata Engineering Kol-E/2024-25/3(4)/345 Dated 16-8-2024 Comprehensive Annual Maintenance for VRF air conditioning system (Voltas make) installed in Big Film Studio. CRT building and Sound department at SRFTI, Kolkata
Operation & Maintenance EFA system i/c fire fighting system at SRFTI, Kolkata (SH: Replacement of defective butterfly valve, foot valve, damaged M.S pipe etc and providing & fixing various signage board as reqd) CCW AIR Kolkata Engineering AE(E)/SRFTI-II/2024-25/11/87 Dated 16-08-2024 Operation & Maintenance EFA system i/c fire fighting system at SRFTI, Kolkata (SH: Replacement of defective butterfly valve, foot valve, damaged M.S pipe etc and providing & fixing various signage board as reqd)
ARMO E&M Services at DDB, Tower-B, Mandi House, New Delhi. (SH: Replacement of existing sprinkler with sprinkler flexible pipe at 3rd floor corridor) CCW AIR Engineering 06/AE(E)/MH-II/2024-25/273 Dated 16-08-2024 ARMO E&M Services at DDB, Tower-B, Mandi House, New Delhi. (SH: Replacement of existing sprinkler with sprinkler flexible pipe at 3rd floor corridor)
NIQ for providing CC ramp in front of entrance gate at Akashvani transmitter Andawa Prayagraj CCW, AIR Prayagraj Engineering AE(C)/PYG/2024-25/22 to 28 Dated 13-8-2024 NIQ for providing CC ramp in front of entrance gate at Akashvani transmitter Andawa Prayagraj
External repair and painting including necessary repairs, plastering and water proofing at terrace of Block C building of MSQ of VBS Akashwani, Borivali, Mumbai-91 CCW, AIR Mumbai Engineering EEC/MUM/2024-25/20 Dated 14-08-2024 External repair and painting including necessary repairs, plastering and water proofing at terrace of Block C building of MSQ of VBS Akashwani, Borivali, Mumbai-91
Establishing LAN connection at 10th floor (New Media Wing), Soochna Bhawan, New Delhi. CCW, AIR Engineering 5(1)/AE/SB/NIQ/24-25/76 Dated 14-08-2024 Establishing LAN connection at 10th floor (New Media Wing), Soochna Bhawan, New Delhi.
Budgetary Quote for 1 no. AC-DC Switching Power supply(BPEU3007) for10KW DBE FM Transmitter PA Akashvani & Doordarshan Engineering ADG(E)(SZ)/SMT/IEBR/METP/24-25 Dated 14-08-2024 Budgetary Quote for 1 no. AC-DC Switching Power supply(BPEU3007) for10KW DBE FM Transmitter PA

Supplies/Works Awarded to Date of Award Reference No. Basis of Award
Data Not Found