A/R & M/O of NBH, Mumbai-20 SH: Painting to news section room, repairs to pipe line of cooling tower and painting works |
CCW AIR Mumbai |
Engineering |
AEC/NBH/MUM/QTN/06/2024-25/84 Dated 14-06-2024 |
|
SITC of Mast Light on Height of 150 mtrs of FM Tower (as per Scope of work Annexure-2) at Akashvani, 5KW FM Ajmer |
Akashvani Ajmer |
Engineering |
AJM/METP/2023/S/G Dated 14-06-2024 |
|
Providing aluminium partition and G.I metal false ceiling in OB Van garage and glass panes in KU band room for DDK at Lucknow (UP) |
CCW. AIR Lucknow |
Engineering |
AE(C)-I/LKO/W-7/2024-25/118-123 Dated 14-06-2024 |
|
DSETC of 100 M Self Supporting Lattice Steel FM Tower including foundation work and provisions of mountings for installation of VHF FM Antenna etc. for AIR at Ratlam (M.P) |
CCW, AIR, Bhopal |
Engineering |
SEB/NIT/RATLAM/TOWER/15032024/3RD CALL |
|
DSETC of 100 M Self Supporting Lattice Steel FM Tower including foundation work and provisions of mountings for installation of VHF FM Antenna etc. for AIR at Rewa (M.P) |
CCW, AIR, Bhopal |
Engineering |
SEB/NIT/REWA/TOWER/14032024/3RD CALL |
|
Replacement existing AC plant by 3X11 TR Air cooled system at Akashvani, Transmitter, Ratnagiri |
CCW, AIR Mumbai |
Engineering |
018/EDM/MUM/2024-25 Dated 14-06-2024 |
|
Up gradation of Infrastructure for NFAI Ph.-II Pune (SH:SITC of 380/400 KVA DG set and Power factor panel for Dehumidifier Load for Color Film vault at NFAI Ph-II) |
CCW, AIR Mumbai |
Engineering |
03/NIT/SEE/CCW/NGP/2024-25/R001 Dated 14-06-2024 |
|
Annual repairs & maintenace of NFDC (Films Divison Complex), Pedder Road, Mumbai-26 SH: Cutting/trimming/pruning the over grown tree branches of big trees as per BMC requirement |
CCW, AIR Mumbai |
Engineering |
EEW-67(2)/MUM/2024-25/AC/48 Dated 13-06-2024 |
|
ARMO E&M services at DDB, Tower A Mandi House, New Delhi (SH: Supplying and replacement of 2X2 LED luminaries in Room No. 604 & 605) |
CCW, AIR |
Engineering |
15/AE(E)/MH-1/NIQ/2024-25/49 Dated 13-06-2024 |
|
External and Internal (excluding stair case)painting of New office building for Akashvani at Lucknow |
CCW, AIR Lucknow |
Engineering |
06/EE(C)/LKO/2024-25 Dated 13-06-2024 |
|