| Jungle Clearance around Guy-Anchors including pathway at 20 KW Transmitter Site at Akashvani Kulathur, Trivandrum |
Akashvani Kulathur, Trivandrum |
Engineering |
01/AEC-1/TVM/2025-26 Dated 09-07-2025 |
|
| Repairs to 150mm dia. Borewell at DDK Staff Quarters, HMT Layout, BENGALURU. SH: Camera Scanning, Flushing of Borewell and Lifting of Submersible Pumpset from Borewell and Reinstallation of the pumpset after flushing. |
CCW, AIR BENGALURU |
Engineering |
AE(E)/BNG/W-2/2025-26/36 Dated 09-07-2025 |
|
| External repair and painting for outer side of Room No. 023 to 227 for Boy’s Hostel at SRFTI, Kolkata |
CCW, AIR Kolkata |
Engineering |
16/AE(C)-II/SRFTI/KOL/NIQ/2025-26 Dated 08-07-2025 |
|
| Special repair at security cabin at DDK Worli Mumbai (SH- Rewiring and fans & fittings & SDB I/c Supplying and laying cable) |
CCW, AIR Mumbai |
Engineering |
013/EDM/MKUM-II/2025-26 Dated 08-07-2025 |
|
| Providing racks in ENG section for Storage at DDK Trivandrum |
DDK Trivandrum |
Engineering |
04/AEC-II/TVM/2025-26 Dated 07-07-2025 |
|
| Inviting budgetary quotation for providing, fabrication & fixing of acoustic treated false ceiling, acoustic treated wall paneling including wainscot of Talk Studio, Transmission Booth studio, Control Room and other technical area including dismantling of material, painting POP & polishing work at Akashvani Agra (UP) |
ADG(E-NZ) Akashvani & Doordarshan |
Engineering |
AIR-Co/Aga/2V/3/2025-26/Inst.//(Refurbishing of Studios) Dated 07-07-2025 |
|
| Inviting budgetary quotation for providing, fabrication & fixing of false ceiling, wall panelling, painting, polishing, POP, wooden cornice & other related scope in transmitter hall & other technical area including dismantling material of existing area at DD Site Leh (Ladakh-UT). |
ADG(E-NZ) Akashvani & Doordarshan |
Engineering |
Leh/2V/3/2025-26/Instt./(Departmental Work) Dated 07-07-2025 |
|
| Technical Specifications with Suggestive Block Diagram and Suggestive BOM for SITC of Disaster Recovery Centre for DD Free Dish Platform at Old Akashvani Complex, LB Nagar, Hyderabad |
DG: Doordarshan |
Purchase |
19(2)2023-24EI(P)TVDraftspecifications Dated 07-07-2025 |
|
| Operation & maintenance of 2X7.5 Tr. Capacity air cooled A.C. Plant 32000 c.f.m capacity forced ventilation system i/c window type, split type air-conditioners & operation of all VRF type AC units, AMC of AC system at Animation Building. CRT, Audiography , film studio, small studio, Editing Block, Academic block, Bry-Air dehumidifier at SRFTI, Kolkata |
CCW, AIR Kolkata |
Engineering |
EE(E)/Kol/NIT/08 of 2025-26 Dated 04-07-2025 |
|
| Engagement of one no wireman to look after the Electrical installation at Akashvani Bhawan, Kolkata |
CCW, AIR Kolkata |
Engineering |
EE(E)/Kol/NIT/09 of 2025-26 Dated 04-07-2025 |
|