Corrigendum /Addendum-I to NIT-50/2023 in r/o Tender No. 12(102)11/RF Cable/2023/692/D(P-S)Cell for the Supply of RF Coaxial Foam type Cable for VHF FM Transmitter Setup |
DG: AIR |
Purchase |
NIT-50/2023 |
|
Supplying and Replacement of Addressable Fire Alarm Panel for ground floor at DTH Todapur, New Delhi |
CCW, AIR |
Engineering |
16/AE(E)/NIT/IPE/2023-24 Dated 14-03-2024 |
|
Water proofing and repairs to roofs of PCR, C & D Automation, Kisan graphics, Library, Officers Chambers & Conference room at CPC, Doordarshan, New Delhi |
CCW, AIR |
Engineering |
SE(C)-II/NIT/CCW/2023-24/01 Dated 14-03-2024 |
|
ARMO all E&M Services at DDB, Tower-A, Mandi House New Delhi (SH: Supplying & fixing of 2X2 LED fitting in room no. 501) |
CCW, AIR |
Engineering |
15/AE(E)/MH-I/NIQ/2023-24/344 Dated 14-03-2024 |
|
Supply, Installation, Testing & Commissioning of 6X16.5/17 Ton air-cooled packaged air conditioning plants at Akashvani Lucknow (UP) |
Akashwani & Doordarshan |
Engineering |
AIR-Co/Lucknow/2V/3/2023-24/Instt./(6X16.5/17 Ton AC Plant) Dated 14-03-2024 |
|
Corrigendum-2 Non comprehensive AMC for VOLTAS make Centralized AC Plant 60 TR X 4 & Cooling Tower 2 nos. at DDK Building & 50 TR X 4 & Cooling Tower 2nos at PPC Building at DDK, Guwahati-781024 |
DDK, Guwahati |
Engineering |
DDK/ENGG Store/2023-24/659 Dated 11-03-2024 |
|
Corrigendum- Non comprehensive AMC for VOLTAS make Centralized AC Plant 60 TR X 4 & Cooling Tower 2 nos. at DDK Building & 50 TR X 4 & Cooling Tower 2nos at PPC Building at DDK, Guwahati-781024 |
DDK, Guwahati |
Engineering |
DDK/ENGG Store/2023-24/597 Dated 04-03-2024 |
|
Providing, fabricating & fixing of AC supply duct, return duct and plenum chamber's at AIR Haldwani |
AIR & Doordarshan |
Engineering |
Haldwani/2v/3/2023-24/Instt(AC Duct)Dated 14-03-2024 |
|
A,B & C type treatment in Studios & Technical area at AIR Haldwani |
Akashwani & Doordarshan |
Engineering |
Haldwani/2V/3/2023-24/Instt(A,B & C type treatment) Dated 14-03-2024 |
|
Part time engagement of Data entry operator and MTS for Division office at CCW Akashvani, 9 Rani Laxmi bai Marg Lucknow (for the period of 01.04.2024 to 30.06.2024) |
CCW, AIR Lucknow |
Engineering |
AE(C)-I/LKO-17/2023-24/530 Dated 13-03-2024 |
|