| Corrigendum- External Repairing of damaged boundary wall of H.P.T Bargadahi Akashvani, Gorakhpur(UP) |
CCW, AIR Lucknow |
Engineering |
97/EE(C)/LKO/2025-26 Dated 09-03-2026 |
|
| Corrigendum- External and Internal finishing i/c removing of seepage inside & out side portion of 10 KW FM Tr. building at Akashvani, FM Nanpara |
CCW, AIR Lucknow |
Engineering |
93/EE(C)/LKO/2025-26 Dated 09-03-2026 |
|
| Water proofing treatment & Internal wall painting of Old and New RNU buildings Located in DDK campus at Shankar Nagar Raipur (C.G.) during the year 2025-26 |
CCW, AIR, Bhopal |
Engineering |
16/EEC/CCW/AIR/BPL/2025-26 Dated 09-03-2026 |
|
| Providing new A.C ducting inside Earth Station & new Studio i/c modification of existing system, diffusers etc as required at Doordarshan Kendra, Agartala |
CCW, Akashvani, Guwahati |
Engineering |
18/EE(E)/GHY/4(17)/NIT/2025-26 Dated 06-03-2026 |
|
| Replacement of existing internal conventional lighting system by new energy efficient LED lights with provision of DALI dimmable system along with 3D LED Akashvani Logo to increase asthetic appeal inside studio complex alongwith Outdoor asthetic lights at AKashvani Imphal (SH: Replacement of existing internal conventional lighting system by new energy efficient LED lights,Providing Cove false ceiling and LED strip Cove lighting in all studios, including the entrance foyer, Background canvas painting of all perforated cardboard inside the studios and studio console room, chandelier in the foyer) |
CCW, Akashvani, Guwahati |
Engineering |
GHY-EE(E)/2025-26/4(17) Dated 06-03-2026 |
|
| Internal Renovation and Up-gradation of 11th Floor at Soochna Bhawan, New Delhi |
CCW, AIR |
Engineering |
CE/CCW/SSWI/NIT/2025-26/03 Dated 06-03-2026 |
|
| Internal painting of room and corridor on first floor at Akashvani Nagpur |
CCW, AIR Pune |
Engineering |
40/EEC/CCW/AKASHVANI PUNE/2025-26 Dated 06-03-2026 |
|
| Internal painting of room and corridor on first floor at Akashvani Nagpur |
CCW AKASHVANI PUNE |
Engineering |
39/EEC/CCW/AKASHVANI PUNE/2025-26 Dated 06-03-2026 |
|
| Providing vitrified tile flooring to ground floor & first floor corridors in Studio Block at Akashvani Pune |
CCW AKASHVANI PUNE |
Engineering |
38/EEC/CCW/AKASHVANI PUNE/2025-26 Dated 06-03-2026 |
|
| Providing and laying APP waterproofing treatment on terrace of Office Block at Akashvani, Sri Vijay Puram (Portblair) |
CCW, AIR, Chennai |
Engineering |
22/EEC/CCW/AIR/CHN/NIT/2025-26 Dated 06-03-2026 |
|