| O & M of 1 no. 8 passenger Lift at Film studio at SRFTI, Kolkata. [SH Maintenance of 1 No. L. T. Elevator Passenger lift]" |
CCW: AIR Kolkata |
Engineering |
EE (E)/Kol/NIT/08 of 2024-2025 |
|
| Providing of 150 meter borewell at DDK, Jalandhar (Punjab). |
CCW: AIR Chandigarh |
Engineering |
EE(C)/CCW/AIR/CHD/2022-23/12 |
|
| Water proofing treatment with fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers over roofs on transmitter hall at AIR 2x10 KW transmitter, Madina, Rohtak, (Haryana). |
CCW: AIR Chandigarh |
Engineering |
EE(C)/CCW/AIR/CHD/2023-24/14 |
|
| Water proofing treatment of studio block and main entrance hall at AIR Sec 34D, Chandigarh. |
CCW: AIR Chandigarh |
Engineering |
EE(C)/CCW/AIR/CHD/2023-24/16 |
|
| Providing and laying paver block and chequered tiles including repair of drainage at AIR transmitter building Kalpa (H.P). |
CCW: AIR Chandigarh |
Engineering |
EE(C)/CCW/AIR/CHD/2024-25/8 |
|
| Internal painting at 1st floor of office bldg. AIR Station Rohtak, (Haryana). |
CCW: AIR Chandigarh |
Engineering |
EE(C)/CCW/AIR/CHD/2023-24/20 |
|
| Supply, Installation, Testing and Commissioning of HT Load Break Switches at HPT Namboor, AIR Vijayawada |
CCW: AIR Bengaluru |
Engineering |
03/EE(E)/BNG/2024-25 |
|
| Publishing the Notice for extension of period for budgetary quote for estimation of cost for AC Plants |
ADG(E): West Zone |
Engineering |
ADG (E)(WZ)/AIR-P/Repl. Of AC Plant/ 2024-25 |
|
| Providing & laying vitrified floor tiles in Room No. 781, 783, 778 & 758 at 7th floor & Room No. 30 at ground floor including other Misc. Civil Repair work in Publication Division, Soochna Bhavan, New Delhi. |
CCW: AIR DELHI |
Engineering |
06/EE(C)/Div.-III/2024-25 |
|
| Supplying,Installation,Testing and Commissioning of 50 KVAr APFC Panel at All India Radio, Transmitter, Jhalukbari (Guwahati) |
CCW: AIR Guwahati |
Engineering |
04/EE(E)/GHY/NIT/2024-25 |
|