Structural and other repairs to C block (C9-C16 block) of staff quarters of Akashvani, Vijayawada |
CCW AIR Vijayawada |
Engineering |
05/EE(C)/CCW/AIR/HYD/2023-24 |
|
Providing RBT barbed wire fencing for collapsed portion of compound wall near tower in TV HPT Campus and front side of staff quarters Campus at TV HPT, Warangal |
CCW, AIR Hyderabad |
Engineering |
07/EE(C)/CCW/AIR/HYD/2023-24 |
|
Replacement of existing steel window with aluminum windows at front side of AIR Markapur |
CCW, AIR Hyderabad |
Engineering |
04/EE(C)/CCW/AIR/HYD/2023-24 |
|
Supply of 14.8 Volt 190 WH V mount battery 2 nos at Doordarshan Kendra Mumbai |
DDK Mumbai |
Engineering |
2023_DD M_725719_1 |
|
Cleaning and repairing of sewerage system, repair of plinth protection, misc civil works around hostel building, DDK, Srinagar |
CCW, AIR Jammu |
Engineering |
EE(C)/CCW/JMU/NIT/2023-24/10 |
|
P/F/T/C of 1.5 TR. Capacity 5 Star Split AC in Room No. PD 80 by Replacing Un-Serviceable old AC. at SRFTI Kolkata |
CCW, AIR Kolkata |
Engineering |
EE(E)/Kol/SD-II/NIT/17 of 2023-24 |
|
Service Connection of two Nos lifts and shaft lighting in Academic Bidg and in Animation Bldg. at SRFTI Kolkata |
CCW, AIR Kolkata |
Engineering |
EE(E)/Kol/SD-II/NIT/16 of 2023-24 |
|
Providing & Fixing of 2 Tr. Split type Airconditioning Machine at Animation Department, Room No. ANI-106 at SRFTI, Kolkata |
CCW, AIR Kolkata |
Engineering |
EE(E)/Kol/SD-II/NIT/15 of 2023-24 |
|
External painting to Monty room, CCW room, and Granite works of AIR Vijayawada |
AIR Vijayawada |
Engineering |
08/AE(C)VSP-VJY/2023-24 |
|
Retrofitting and painting works to news room (Room No.108) at first floor, NBH, Mumbai-20 |
CCW AIR MUMBAI |
Engineering |
AEC/NBH/MUM/QTN/06/2023-24/167 |
|