1st Extension for Submission of E-Tender/Procurement of Capacitors/EQ-24 |
DDK Kolkata |
Engineering |
Kol-TV/1(2)/2021-22/E-Tender/Procurement of Capacitors/EQ-24 |
|
Construction of 10 KW FM Transmitter building at SSB Complex, Maharajganj (UP)(Balance Work) |
CCW, AIR |
Engineering |
Re-SE(C)-I/2021-22/02 |
|
Supply of 24 Nos. Capacitor 3300 micro Farad, 450 Volt(used in 100 KVA UPS make Riello) as per detailed specification/datasheet attached with e-Tender at Doordarshan Kendra Kolkata |
DDK Kolkata |
Engineering |
Kol/TV/1(2)/2021-22 |
|
ARMO E & M services at DDB Tower-A-B-C, Mandi House, New Delhi (SH: Comprehensive maintenance contract of Blue Star make 300 TR water cooled screw chilling machine installed at Tower B) |
CCW, AIR |
Engineering |
22/EE(E)-P/NIT 2021-22 |
|
Construction of septic tank for ground floor toilets at the side of canteen (near transformer) at AIR Kannur |
CCW, AIR |
Engineering |
07/EEC/Kochi/2021-22/R2 |
|
Renovating the floors of old transformer rooms at AIR Calicut |
CCW, AIR Kochi |
Engineering |
01/NIQ/EEC/Kochi/2021-22/R1 |
|
SITC of 180 watt LED PAR LIGHT (10 nos.)as per specifications-Annex 2 at Doordarshan Kendra Mumbai |
DDK Mumbai |
Engineering |
EPNIT 29/EI(ES)2(6)/DKM/2021-22 |
|
ARMO Electricals works at NFAI Pune for 2021-22 (Phase-II). (SH: Operation and maintenance of AC Plant for Nitrate Vaults at NFAI PH-II) |
CCW, AIR Mumbai |
Engineering |
02/SEE/NGP/NIT/CCW/2021-22 |
|
Operation of 3 Nos 200 KVA DG sets at SRFTI, Kolkata (SH: Annual Maintenance of 1 no 200 KVA Greaves make silent DG set for the year 2021-22) |
CCW, AIR Kolkata |
Engineering |
AE(E)/SRFTI-II/2021-2022/11/131 |
|
Replacement of condenser pipeline i/c pot strainers butterfly valve and AHU base tray etc for CAC plant at SRFTI, Kolkata(SH: Repairing of one no. 90 Tr. capacity compressor base foundation i/c overhauling of the compressor of CAC plant)(Re-Call) |
CCW, AIR Kolkata |
Engineering |
EE(E)/Kol/SD-II/NIT/05 of 2021-22 |
|