Replacement of 6X15 TR AC plant by 5X16.5 TR Air Cooled AC plant at Transmitter complex Akashvani Nagpur |
CCW, AIR Nagpur |
Engineering |
04 (R)NIT/SEE/CCW/NGP/2024-25/1st Recall Dated 29-01-2025 |
|
Renovation of office building first floor Gents toilet (2 Nos.) for Doordarshan at Lucknow (UP) |
CCW, AIR Lucknow |
Engineering |
52/EE(C)/LKO/2024-25 Dated 29-01-2025 |
|
Providing and fixing sliding shutter to existing green marble cupboard including sun-mica, sliding track & vitrified tile flooring etc. for Admin and Account Section, 4th Floor, NBH, Mumbai-20 |
CCW, AIR Mumbai |
Engineering |
EEC/MUM/2024-25/56 Dated 30-01-2025 |
|
Renovation works to Academic section room No. 322 & 323 and store room at 2nd floor of TV Building for FTII, Pune |
CCW, AIR Pune |
Engineering |
35/EEC/CCW/AKASHVANI/PUNE/2024-25 Dated 29-01-2025 |
|
Providing Vitrifies tile flooring, painting & windows replacement in AC Plant Room at Akashvani Studio, Sangli |
CCW, AIR Pune |
Engineering |
34/EEC/CCW/AKASHVANI/PUNE/2024-25 Dated 29-01-2025 |
|
Repairing roof top of Studio and Armguard building at Akashvani Belonia |
Akashvani, Belonia |
Engineering |
J-12013/100/2024-Engg-AIR Belonia Dated 22-01-2025 |
|
SITC of four sections L.T Cubical Panel along with Installation, Testing & commissioning of one no existing 750KVA, Transformer & one no 125KVA, DG Set, Service connection cable, Earthing etc complete as required at 300KW Transmitter, Akashvani, Dibrugarh |
CCW, AIR Guwahati |
Engineering |
GHY-EE(E)/2024-25/4(17)/1469-1475 Dated 29-01-2025 |
|
Raising the road level in water logging water near the E Type Quarters road towards the transmitter building including painting of entrance gate portion at HPT, Akashvani, Avadi, Chennai- 62 |
CCW, AIR Chennai |
Engineering |
32/EEC/CCW/AIR/CHN/NIT/24-25 Dated 28-01-2025 |
|
Internal painting to 1st and 2nd floor of E-Block at EPFO office, Royapettah, Chennai- 14 |
CCW, AIR Chennai |
Engineering |
31/EEC/CCW/AIR/CHN/NIT/24-25 Dated 28-01-2025 |
|
Providing GI Profile sheet roofing with Ms tubular members for open staircase and corridor at DDK guest house Coimbatore |
CCW, AIR Chennai |
Engineering |
30/EEC/CCW/AIR/CHN/NIT/24-25 Dated 24-01-2025 |
|