| Amendment-Hiring of taxis at DDK, Ahmedabad |
Doordarshan |
Engineering |
AHM:DD:48(1)TR/HT |
|
| Restoration of Fire Fighting System of Phase 1, Phase2, NMIC and premises |
All India Radio |
Engineering |
44/EDM/MUM/20-21 |
|
| Semi Comprehensive maintenance of Window, Split, Cassette & Tower type AC units installed at Tower-B |
All India Radio |
Engineering |
NIT/SE(E)/NZ/2020-2021/07 |
|
| Strengthening of power supply distribution arrangement in studio-I & II and Electric Room at FTII, Pune |
All India Radio |
Engineering |
43/EDM/Pune/20-21 |
|
| Extension - Reconstruction of damaged RCC wall at Rear side of transmitter hall including |
All India Radio |
Engineering |
CCW(B)2020-21-W/3(4)7 |
|
| Corrigendum Refilling of existing fire extinguishers at AIR Amtala, Chandi and Shantiniketan |
All India Radio |
Engineering |
EE(E)/Kol/SD-I/NIT/40 |
|
| Providing 130M deep borewell at AIR Sasaram, Providing 100M deep borewell for FM site at SSB campus Sitamarhi, Construction of metering room of size 2.00m X2.00 at FM AIR Narkatiyaganj Bihar |
All India Radio |
Engineering |
03,04,05/2020-21/EEC/PAT |
|
| Raising of existing waterlogged road and front area of studio building at AIR Darbhanga |
All India Radio |
Engineering |
29/EE(C)/CCW/AIR/PD/2020-21 |
|
| Corrigendum/Addendum-VI to NIT-39/2020 |
All India Radio |
Purchase Section |
1(63)1/DSITC/2020/D(P)674-D(P-S)Cell/E |
|
| Replacement of uprooted Street Light Poles, Street Light fittings along with damaged UG Armoured Cable etc. due to effect of Super Cyclone "000000000AMPHAN" at DDK Kolkata |
All India Radio |
Engineering |
EE(E)/KolSD-I/NIT/42 |
|