air pressure leakage testing of RF Feeder cable |
All India Radio |
Engineering |
GKP 1(2)/2018 19/E |
|
Rewiring of O B Van and DG Room including fans and fittings with SDBs |
All India Radio |
Engineering |
46/EDM/AHM/2018-19 |
|
Construction of 1 KW FM Tr Building Sentry Post and d works at Champawat UK |
All India Radio |
Engineering |
79/EEC/LKO/2018-19 |
|
Construction of 10KW FM transmitter building reception room and development of work at Etawah UP |
All India Radio |
Engineering |
80/EE(c/LKO/2018-19 |
|
Providing handicapped toilet 4 Nos and ramp 4 Nos at JNV Almora UK |
All India Radio |
Engineering |
81/EE(C/LKO/2018-19 |
|
Maintenance of Air-cooler with repairing and making operational with regular watering |
All India Radio |
Engineering |
SE(E/NGP/CCW/7(2/Air cooler maint/part II/2018-19/964 |
|
Servicing and overhaulimg of HT VCB LT VCB and relay calibration work |
All India Radio |
Engineering |
427 |
|
Draft Specification for Supply of Encoders and IRDs at 11 Earth Stations |
Doordarshan |
Engineering |
2018 198E1(P)TV |
|
Deployment of Contractual Data Entry Operator |
All India Radio |
Engineering |
5/2/E |
|
Deployment of Contractual Multitasking Staff |
All India Radio |
Engineering |
6/2/E |
|