Specification for Supply of Test Loop Translator System for 11 Earth Station for 11 Locations |
Doordarshan |
Engineering |
19(2)2018 19E1P |
|
Construction of Studio Cum office building for 10KW FM Transmitter from AIR at Nellore. SH-Providing inaugural plague stone and name board on either side of security gate including fire fighting val |
All India Radio |
Engineering |
AE(C/CCW/CHN/AIR/2018-19/ |
|
Health inspection pf early fire alarm system |
All India Radio |
Engineering |
AE(E)/CCW/AHM/NIQ/2018-19/51 |
|
Construction of 5 KW FM Transmitter building AGD and Reception room at AIR Gauriganj Amethi UP. SH-Boring of tubewell |
All India Radio |
Engineering |
76/EE(C)/LKO/2018-19 |
|
Maintenance of E and M services at Soochna Bhawan New Delhi.(SH-SITC of 24 port Ethernet LAN switch Giga at 1st floor) |
All India Radio |
Engineering |
5(1/AE(E/SB/18-19/ |
|
Operation General Maintenance of Centralized type AC Plants Early Fire alarm system DG Set Passenger Cum Good Lift Comprehensive maqintenance of slit ductable type AC and engagement of helper |
All India Radio |
Engineering |
1829 |
|
Auction of surplus and obsolete stores |
All India Radio |
Engineering |
Mum 1(10) |
|
Miscellaneous repairs/Strengthening works of self radiating 100kW MW Mast at AIR Jagdalpur Mumbai |
All India Radio |
Engineering |
ENGP(100 KW MW TR Jagdalpur Mast)11TR/2018-19 |
|
Extension Notice-Testing Refilling Repairing and Painting of Extinguishers at HPT All lndia Radio Bambolim GOA |
All India Radio |
Engineering |
HPT/Bombay/1(2)/2019/OE/74 |
|
Extension Notice-pump operation and plumping works Electrical works at staff quarters Holiday home and office at HPT All lndia Radio Bambolim GOA |
All India Radio |
Engineering |
HPT/Bombay/1(2)/MW/E/75 |
|