| Providing wheel trolley mounted self-priming 2.2KW/3HP 3 phase mono block pump set for use in flood/sewage i/c providing PVC suction and delivery pipe line for staff quarters at Kingsway camp Delhi |
CCW, AIR |
Engineering |
14/AE(E)/KWC/NIQ/2025-26/49 Dated 14-10-2025 |
|
| NIT for IP Based connectivity & Studio expansion works at DDK Hyderabad and DDK Aizawl |
DG:Doordarshan |
Procurement Section |
21/2025-26 Dated 13-10-2025 |
|
| Repairs and Internal Painting of Office Building, Akashvani Thrissur |
CCW, AIR Kochi |
Engineering |
15/EEC/Kochi/2025-26 Dated 13-10-2025 |
|
| Replacement of damaged Inlet and Outlet pipe line of Over Head Tank with sluice valve for Akashvani at Lakhimpur Kheri (UP) |
CCW, AIR Lucknow |
Engineering |
42/EE(C)/LKO/2025-26 Dated 13-10-2025 |
|
| ARMO E&M services at DDB Tower-B, Mandi House, New Delhi. (SH: Providing Y strainer in existing vertical suction line of condenser pump) |
CCW, AIR |
Engineering |
EE(E)-P/NIQ/MH/DDB-Tower-B/2025-26/1074 Dated 13-10-2025 |
|
| External painting of block A, B, C, D and E type staff quarters and over head tank with pump room for Akashvani Colony at Lucknow |
CCW, AIR Lucknow |
Engineering |
48/EE(C)/LKO/2025-26 Dated 13-10-2025 |
|
| Internal & External finishing of D type Qts. at Akashvani Jhansi |
CCW, AIR Lucknow |
Engineering |
47/EE(C)/LKO/2025-26 Dated 13-10-2025 |
|
| Maintenance of E&M services at Soochna Bhawan New Delhi. (SH: Replacement of defective control wiring and spares etc in star delta starter of pumpset) |
CCW, AIR |
Engineering |
5(1)/AE/SB/NIQ/25-26/152 Dated 13-10-2025 |
|
| Internal wall painting to ceiling and beam from ground to 5th floor including repairs of false ceiling, Pigeon net and change of toughened glass at NMIC building, NFDC-FD Complex Mumbai 26 |
CCW, AIR Mumbai |
Engineering |
EEW-67(2)/MUM/2025-26/AC/379 Dated 10-10-2025 |
|
| Removing and re-fixing of tank, structural support and epoxy paint to same at 6th floor terrace ASF building DDK, Worli, Mumbai |
CCW, AIR Mumbai |
Engineering |
EEW-67(2)/MUM/2025-26/AC/377 Dated 10-10-2025 |
|