| Refurbishing of internal electrical installation with new copper wiring/Rewiring, MCBs, P/F energy saving LED light fittings, BLDC ceiling/wall Fans, computer points, AC points etc in news rooms and its adjacent corridor at 1st floor, News Section, DDK Office Campus, Kolkata |
CCW, AIR Kolkata |
Engineering |
EE(E)/Kol/SD-I/NIT/14 of 2025-26 Dated 05-12-2025 |
|
| "A/R & M/O Akashwani Bhawan, New Delhi during the year 2025-26. (SH: Painting of various Rooms (Upto 4th floor) at Akashwani Bhawan, New Delhi.)" |
CCW:Akashwani |
Engineering |
46/EE(C)/MHPD/AKB/2025-26/09 Dated 05-12-2025 |
|
| Draft Technical Specification for SITC of New Network Cabling at Akashvani, Delhi for seeking Vendors/OEMs feedback and budgetary quote |
Akashvani, Delhi |
Engineering |
AIR/DEL/NBH/CMU/NetworkCablinginNBH Dated 05-12-2025 |
|
| Structural repairs, painting around studio building and MTR portion and providing weather shed over roof of NBH (Excluding MTR), Akashvani, Mumbai-20. SH: Providing and fixing 160mm Diameter PVC rain water pipe at MTR side of Akashvani, NBH, Mumbai 20 (Balance work) |
CCW, AIR Mumbai |
Engineering |
EEW-67(2)/MUM/2025-26/AC/462 Dted 04-12-2025 |
|
| Construction of compound wall for a length of 25.00 m at the front side of guest house at DDK Trivandrum |
CCW, Akashvani & DD KOCHI |
Engineering |
20/EEC/Kochi/2025-26 Dated 04-12-2025 |
|
| Replacement of damaged false ceiling in toilets at Ground Floor Sector - A & Gents Toilet of Sector - B, Ist Floor - Gents Toilet of Sector - B, 4th Floor - Gents Toilet of Sector - B, 5th Floor - Toilet of Sector C at Akashwani Bhawan, New Delhi |
CCW, AIR |
Engineering |
45/EE(C)MHPD/AKB/2025-26/07 Dated 04-12-2025 |
|
| A/R & M/O Akashwani Bhawan, New Delhi during the year 2025-26. (SH: Provision of shed to cover the storage area at Akashwani Bhawan, New Delhi.) |
CCW, AIR |
Engineering |
44/EE(C)MHPD/AKB/2025-26/07 Dated 04-12-2025 |
|
| Providing Surge Protection Device and Copper plate earthing at 10 KW FM Transmitter Akashvani Nagpur |
CCW,AIR Nagpur |
Engineering |
03/EEE/NGP-SD/2025-26 Dated 04-12-2025 |
|
| Renovation of Furniture on 4th floor, Room No. C75, C76 & C77 of RNU at DDK Mumbai |
CCW, AIR Mumbai |
Engineering |
EEC/MUM/2025-26/33 Dated 04-12-2025 |
|
| Supply of Signal Transportation Vans based on LEO (Low Earth Orbit) Satellites Connectivity along with necessary Bandwidth |
DG:Doordarshan |
Procurement SectionDG:Doordarshan |
8(15)2025-26 EI(P)TV Dated 03-12-2025 |
|