| Replacement of existing shutters by 30mm thick WPC shutters to bath & WC of Type I staff Quarters for FTII, Pune |
CCW, AIR Pune |
Engineering |
08/EEC/CCW/ AKASHVANI/PUNE/2025-26 Dated-09-07-2025 |
|
| Repair of external cracks and external painting to Type II, Type III, Type IV and Type V Staff Quarters at New Land Site for FTII, Pune |
CCW, AIR Pune |
Engineering |
07/ EEC/ CCW/AKASHVANI /PUNE/2025-26 Dated- 09-07-2025 |
|
| Renovation of existing windows with aluminium powder coated sliding windows to Lab Editing Building for FTII, Pune |
CCW, AIR Pune |
Engineering |
06 / EEC / CCW / AKASHVANI /PUNE/2025-26 Dated- 09-07-2025 |
|
| Letter for Providing and fixing of false ceiling with provisions of space for LED Recess lights 2’x2’, Supply & Return Defusers at DTH Todapur |
ADG(E-NZ),Soochna Bhawan |
TV Project Cell |
ADG(NZ)/TVP(25-26)/Providing and fixing of false ceiling/DTH Todapur Dated 09-07-2025 |
|
| Jungle Clearance around Guy-Anchors including pathway at 20 KW Transmitter Site at Akashvani Kulathur, Trivandrum |
Akashvani Kulathur, Trivandrum |
Engineering |
01/AEC-1/TVM/2025-26 Dated 09-07-2025 |
|
| Repairs to 150mm dia. Borewell at DDK Staff Quarters, HMT Layout, BENGALURU. SH: Camera Scanning, Flushing of Borewell and Lifting of Submersible Pumpset from Borewell and Reinstallation of the pumpset after flushing. |
CCW, AIR BENGALURU |
Engineering |
AE(E)/BNG/W-2/2025-26/36 Dated 09-07-2025 |
|
| External repair and painting for outer side of Room No. 023 to 227 for Boy’s Hostel at SRFTI, Kolkata |
CCW, AIR Kolkata |
Engineering |
16/AE(C)-II/SRFTI/KOL/NIQ/2025-26 Dated 08-07-2025 |
|
| Special repair at security cabin at DDK Worli Mumbai (SH- Rewiring and fans & fittings & SDB I/c Supplying and laying cable) |
CCW, AIR Mumbai |
Engineering |
013/EDM/MKUM-II/2025-26 Dated 08-07-2025 |
|
| Providing racks in ENG section for Storage at DDK Trivandrum |
DDK Trivandrum |
Engineering |
04/AEC-II/TVM/2025-26 Dated 07-07-2025 |
|
| Inviting budgetary quotation for providing, fabrication & fixing of acoustic treated false ceiling, acoustic treated wall paneling including wainscot of Talk Studio, Transmission Booth studio, Control Room and other technical area including dismantling of material, painting POP & polishing work at Akashvani Agra (UP) |
ADG(E-NZ) Akashvani & Doordarshan |
Engineering |
AIR-Co/Aga/2V/3/2025-26/Inst.//(Refurbishing of Studios) Dated 07-07-2025 |
|