Providing and laying S.W. sewer line from Type V/I staff quarter to type- II/13 to 16 including manhole at HPT AIR Malad, Mumbai |
CCW, AIR Mumbai |
Engineering |
EEC/MUM/2023-24/72 |
|
Repairing deteriorated portion with asphatt macadam and providing 2.5 cm bituminous carpeting to road from gate no. 3 to transmitter building of HPT, AIR, Malad Mumbai-95 |
CCW, AIR Mumbai |
Engineering |
EEC/MUM/2023-24/71 |
|
Providing plain gypsum board false ceiling work with rock wool to space at non-exhibition gallery area on the first floor of Prabhat Museum at Studio No. 1 for FTII, Pune |
AIR Pune |
Engineering |
19/EEC/CCW/AIR/PUNE/2023-24 Dated 13-02-2024 |
|
Special repairs to G.F gents toilet ceiling and portico of AIR office block entrance at AIR, Tuticorin |
CCW, AIR Madurai |
Engineering |
AE(C)/MDU/23-24/43/139 |
|
Providing and fixing G.I.metal false ceiling and repairing of Gypsum false ceiling including painting of wall doors etc between SW transmitter entrance upto MW transmitter hall of AIR, HPT, Bombolim-Goa |
CCW, AIR Mumbai |
Engineering |
EEC/MUM/2023-24/69 Dated 14-02-2024 |
|
Publication of Draft Technical Specification for Server for seeking Vendors/OEMs feedback and Budgetary quote |
Akashvani |
Planning & Development Unit |
J-11018/2/2023-Studio Design-P&D Unit Dated 14-02-2024 |
|
Repair of CPI make 400W HPA Sr No H19822B4 of Scorpio DSNG Van at DDK Mumbai |
DDK Mumbai |
Engineering |
EPNIT 12 EIES 2 ARCA DKM 2023 24 Dated 14-02-2024 |
|
Painting of 25 meter high self supporting STL steel Tower at HPT AIR Malad, Mumbai |
CCW, AIR Mumbai |
Engineering |
AEC-I/BOV/12(NIQ)/2023-24 Dated 13-02-2024 |
|
Renewal of Support, update of Nebero Internet Management Software Installed at DDK Ahmedabad |
DDK Ahmedabad |
Engineering |
1(2)/NEBERO/E(E/S)AHM/2023-24 Dated 13-02-2024 |
|
Construction of Vermiculture pit at Prabhat staff quarters and development of area front of VIP hostel towards new pit for FTII, Pune |
CCW AIR PUNE |
Engineering |
20/EEC/CCW/AIR/PUNE/2023-24 Dated- 13-02-2024 |
|