Replacing down take G.I rusted pipe line to DDG (E)toilet, garden, engineering room, driver cabin & 1st floor ladies toilet of studio block at NBH, Mumbai-20 |
CCW, AIR Mumbai |
Engineering |
AEC/NBH/MUM/QTN/06/2023-24/163 |
|
Fixing sun control film to window pans for account section at 6th floor, repairing leakage of water supply pipe liines at 2nd,3rd&5th floor of ASF Building & replacing damaged Indian type w.c pan for ladies toilet at old transmitter building at DDK,Worli |
CCW, AIR Mumbai |
Engineering |
AEC/DDK/MUM/06/2023-24/Qtn/162 |
|
Special Repairs to NBH, AIR Mumbai (SH: Service Connection to News Section 1st Floor Studio Section) |
CCW, AIR Mumbai |
Engineering |
AE(E)/CCW/MUM/NIQ/2023-24/4 |
|
Installation of LED light (False ceiling)and renovation of various rooms of PCI, Soochna Bhawan, New Delhi |
CCW, AIR |
Engineering |
1(47)(1)/EE(E)-II/AC/2023-24/414 |
|
Renovation of Room No. 004 and filling of trench inside sound studio with cement concrete at SRFTI, Kolkata |
CCW, AIR Kolkata |
Engineering |
11/AE(C)/SRFTI/KOL/NIQ/2023-24 |
|
Part time engagement 1 Data entry operator and MTS for Division office at CCW AIR 9, Rani Laxmi bai Marg Lucknow (for the period of 01.09.2023 to 31.12.2023) |
CCW, AIR Lucknow |
Engineering |
01.09.2023 to 31.12.2023) |
|
Repairing and painting of old pump room and other miscellaneous work in switch gear room at DDK Varansi |
CCW, AIR Lucknow |
Engineering |
28/EE(C)-III/LKO/2023-24 |
|
Providing & Fixing of 2Tr. Split type Airconditioning Machine at Animation Department, Room No ANI-106 at SRFTI, Kolkata |
CCW, AIR Kolkata |
Engineering |
EE(E)/Kol/SD-II/NIT/15 of 2023-24 |
|
SITC for replacement of AC plants at Akashvani Bhagalpur, Hazaribagh, Joranda, Kerseong and Ranchi. |
CCW, AIR Kolkata |
Engineering |
AIR/Project/EZ/AC Plant/1/2023 |
|
A/R & M/O Akashwani Bhawan New Delhi during the year 2023-24. (SH: Engagement of sewer man for day to day cleaning of blocked manholes and sewer lines) |
CCW, AIR |
Engineering |
20/EE(C)MHPD/AKB/2023-24/04 |
|