Comprehensive Maintenance of 1 Nos 09 Passenger Omega make Lift at DDK Ahmedabad |
CCW, AIR Mumbai |
Engineering |
044/EDM/MUM-II/2023-24 Dated 26-12-2023 |
|
Setting up of 20 KW FM Transmitter at DD site Akashvani Bhuj (SH: Rewiring of Transmitter Building MCB DB and repairs of 2 pole structure substation) |
CCW, AIR Mumbai |
Engineering |
043/EDM/MUM-II/2023-24 Dated 26-12-2023 |
|
|
|
|
|
|
Extension of date in submission of Quotation for cleaning of bathrooms, toilets located inside the Studios block and in the FM Transmitter block etc at Main Station Akashvani Panjtirthi Jammu. |
CCW, AIR Jammu |
Engineering |
J-15/272/2023-Engg-AIR JAMMU Dated 22-12-2023 |
|
Annual comprehensive maintenance of 2 Nos 13 Passenger Schindler make Lifts at Girls Hostel FTII Pune |
CCW, AIR Mumbai |
Engineering |
041/EDM/FTII Pune/2023-24 Date 22/12/2023 |
|
Construction of Retaining wall (RCC WALL) at Land slide area at AIR/HPT DDK, Mussoorie (UK). |
CCW, AIR, Lucknow |
Engineering |
NIT NO. 43/EE(C)/LKO/2023-24, |
|
Repair Replacement of Sony make XDCAM Deck at DDK Mumbai |
DDK Mumbai |
Engineering |
EPNIT 07 EIES 2 ARCA DKM 2023 24 Dated19 12 2023 |
|
Draft Tender for Supply, Installation, Testing & Commissioning of 3x11 Ton air-cooled packaged air conditioning plants at AIR Mathura (UP). |
ADG(E)(NZ) New Delhi |
Engineering |
AIR-Co/Mathura/2V/3/2023-24/Instt./(3x11 Ton AC Plant) |
|
Draft Tender for Supply, Installation, Testing & Commissioning of 4x16.5 Ton air-cooled packaged air conditioning plants at AIR Allahabad (UP). |
ADG(E)(NZ) New Delhi |
Engineering |
AIR-Co/Allahabad/2V/3/2023-24/Instt./(4x16.5 Ton AC Plant) |
|
Inviting of bids for disposal (through auction proceedings) of green leaves/ small branches of trees as casttle feed for grazing of livestock from HPT, Bantalab site |
AIR Jammu |
Engineering |
J-15/330/2023-Engg-AIR Jammu Dated 09-12-2023 |
|