1 Construction of platform and shed for 125 KVA DG set at DDK Lucknow 2 Integral water proofing treatment over FM Stereo Studio roof at AIR Lucknow |
All India Radio |
Engineering |
10 11 |
|
Comprehensive maintenance of omega make lifts |
All India Radio |
Engineering |
8 |
|
Servicing of 1250 KVA Dry type transformer and HT VCBs |
All India Radio |
Engineering |
7 |
|
SITC of sewage water pump set |
All India Radio |
Engineering |
4 |
|
SITC of UPS for light and fans of lift |
All India Radio |
Engineering |
6 |
|
LAYING OF INTER LOCK PATH WAY AFTER REMOVING ROUBLES FROM SUB STATION AT HPT, ALL INDIA RADIO, BAMBOLIM, GOA. |
All India Radio |
Engineering |
HPT BAM/(2)/2019/MW/ |
|
Draft Technical Specification for Procurement of Digital Sync Pulse Generator with Auto Change over Unit |
Doordarshan |
Engineering |
SD 03/2019 |
|
Mast Painting and SITC of Aviation Light AOL at 100 Mtr FM Tower of AIR Asansol |
All India Radio |
Engineering |
P/1/E-Tender/Mast Painting and Aviation light/Asansole/19-20 |
|
1. Providing service connection cable to Sentry post and replacement of SDB at Transmitter Complex at AIR Hoskote Bengaluru. 2. Replacement of Fluorescent tubes/Conventional PLL lamps with Retrofit |
All India Radio |
Engineering |
AE(E/BNG/W-1/2019-20 |
|
Providing cattle trap near main gate of 2X100KW transmitter building at HPT, AIR, Avadi, Chennai-62. |
All India Radio |
Engineering |
4/2019-20/CHN/SD-CHN/2 |
|