Periodical Maintenance for Existing Desktop computer |
All India Radio |
Engineering |
SEE/NGP/CCW/AC/Computer/2018 19/801 |
|
Providing vitrified tiles in Transmitter hall at HPT TV Kodaikanal |
All India Radio |
Engineering |
AE C/MDU/18-19/26/ |
|
SUB: Repair/ Renovation work of Self Radiating MW Mast at All India Radio Ahmedabad. |
All India Radio |
All India Radio |
No. ENGP (200 KW MW DRM TR Ahmedabad Mast ) 11 TR /18-19 |
|
Replacement of 250 KVA Transformer at AIR Bolangir. |
All India Radio |
Engineering |
Kol E/2018-2019/3(4)/1090 |
|
SUB: Repair Renovation work of Self Radiating MW Mast at All India Radio Rajkot |
All India Radio |
Engineering |
No. ENGP (300 KW MW DRM TR Rajkot Mast ) 11 TR /18-19 |
|
Corrigendum-Repair/Renovation work of Self Radiating MW Mast at All India Radio Rajkot. |
All India Radio |
Engineering |
ENGP (300 KW MW DRM TR Rajkot Mast ) 11 TR /18-19 |
|
Providing RCC Under ground sump well at EPFO office block at Mangalore |
All India Radio |
Engineering |
CCW B 2018 W/3(7)36/ |
|
External Painting with repairs to Studio blocks LT Room DG Room and Cycle shed at AIR Mysuru |
All India Radio |
Engineering |
CCW B 2018 W/3(4)9/ |
|
Miscellaneous Studio Works at AIR Raigarh |
All India Radio |
Engineering |
ENGP Digitalization of Studio Raigarh 18 19 |
|
Miscellaneous Studio Works at AIR Ahwa |
All India Radio |
Engineering |
ENGP Digitalization of Studio AHWA 18 19 |
|