AIR Tenders

Sr No. Section/ Division NIT No. Subject/ Particulars Issued On Last Date Download
91EngineeringHPT BAM/(2)/2019/MW/LAYING OF INTER LOCK PATH WAY AFTER REMOVING ROUBLES FROM SUB STATION AT HPT, ALL INDIA RADIO, BAMBOLIM, GOA. 2019-05-012019-05-24Download
92EngineeringHPT BAM 1(2)2019-E/Enquiry for the supply of work of Painting SW TR Tower at HPT AlR Bambolim Goa 2019-01-172019-02-04Download
93EngineeringGKP8(2/2018-19/E/22 to 28Quotation for comprehensive Annual Maintenance Contract for 350 KVA, 62.5 KVA and -40 KVA Diesel Generator Set at AIR Gorakhpur UP 2019-04-052019-04-29Download
94EngineeringGKP 8(2)/2018-19/E/3323 to 3330Servicing of 350 KVA Diesel Generator Set Make Cummins with materials. 2. Servicing of 350 KVA Diesel Generator Set Make Cummins without materials. 2019-01-082019-01-28Download
95EngineeringGKP 1(2)/2018 19/Eair pressure leakage testing of RF Feeder cable 2019-02-192019-03-19Download
96EngineeringEZ/3(6)/Spl./ METP/ UPS Kurseong/19-20Repair of Existing Eaton Make 40 KVA UPS at 10 KW FM Tr. Kurseong.2019-06-212019-07-12Download
97EngineeringEZ 3(6/IEBR/METP/Mast Strengthning Bhawani Patna/2019-20Supply and Fixing of RF chokes, replacement of RF Insulators, supply and installation of copper plate earthing a tension adjustment of all guy ropes and vertically correction of mast at AIR Bhawani Pa2019-05-172019-06-06Download
98EngineeringENGP:Digitalization of Studio, Surat/11TR/AC Duct/18-19Servicing of AC plant supply and return ducts work at AIR Surat2018-12-122019-01-02Download
99EngineeringENGP-Digitalization of Studio-Balaghat/11ST/18-19ACOSTIC WORK, B TYPE TREATMENT FALSE CEILING ETC. AT DIGITISATION OF BALAGHAT 2019-01-082019-01-29Download
100EngineeringENGP-Digitalization of Studio Surat/18-19Acoustic treatment painting, polishing and other work, in studios of AIR, Surat. 2019-01-082019-01-29Download
.
© Copyright 2018, Website Content Managed by Prasar Bharati (IT Division).
Last Updated on 18/06/2019